Kamalapur metro station: opening, fares and location
Kamalapur will be the next stop after Motijheel, next to Kamalapur railway station. The 1.16 km extension is under construction, and The Business Standard reported in October 2026 that it is expected to open in July 2027. Until then, Motijheel is the nearest metro station.
Where Kamalapur is on the line
Metro fares from Kamalapur
The fares are already on the official chart. The single journey fare from Kamalapur to every station, the price with an MRT Pass or Rapid Pass, and roughly how long the ride takes.
| To | Fare | With card | Time |
|---|---|---|---|
| Uttara North | ৳100 | ৳90 | 40 min |
| Uttara Center | ৳100 | ৳90 | 38 min |
| Uttara South | ৳90 | ৳81 | 35 min |
| Pallabi | ৳80 | ৳72 | 33 min |
| Mirpur 11 | ৳80 | ৳72 | 30 min |
| Mirpur 10 | ৳70 | ৳63 | 28 min |
| Kazipara | ৳70 | ৳63 | 25 min |
| Shewrapara | ৳60 | ৳54 | 23 min |
| Agargaon | ৳50 | ৳45 | 20 min |
| Bijoy Sarani | ৳50 | ৳45 | 18 min |
| Farmgate | ৳40 | ৳36 | 15 min |
| Karwan Bazar | ৳30 | ৳27 | 13 min |
| Shahbag | ৳30 | ৳27 | 10 min |
| Dhaka University | ৳20 | ৳18 | 8 min |
| Bangladesh Secretariat | ৳20 | ৳18 | 5 min |
| Motijheel | ৳20 | ৳18 | 3 min |
What’s near Kamalapur station
- Kamalapur Railway Station
Not sure which station is closest to you? MetroPath’s “Find nearest station” uses your phone’s location, which never leaves your phone.
Future interchange
When MRT Line 1 opens (under construction), Kamalapur will be an interchange: you’ll be able to change here for trains toward Airport.
Frequently asked questions
When will Kamalapur metro station open?
It is under construction. The Business Standard reported in October 2026 that the Motijheel–Kamalapur extension is expected to open in July 2027.
What will the metro fare be from Kamalapur?
The official chart already lists it: ৳100 to Uttara North or Uttara Center, ৳20 to Motijheel, Bangladesh Secretariat or Dhaka University, and ৳30 to Karwan Bazar or Shahbag.
Where is Kamalapur metro station?
Next to Kamalapur railway station, 1.16 km beyond Motijheel. It will be the southern end of MRT Line 6 and an interchange with MRT Line 1.